Sustainability
The Olympic Delivery Authority (ODA) has chosen PVC as material for different temporary venues of the London Olympics 2012. The ODA want to ensure to meet the highest environmental and social standards for the PVC materials. E.g. temporary parts like Roofing covers of the Olympic Stadium, the Water Polo Arena and the Royal Artillery Barracks will be deconstructed and a part will be recycled in the Vinyloop process.
As we have done in the past with materials such as timber and concrete, we want to use the opportunity of hosting the London 2012 Games to work with industry to set new standards. In this case this may help move the industry towards more sustainable manufacture, use and disposal of PVC fabrics.
Dan Epstein Head of Sustainable Development at Olympic Delivery Authority (ODA)
The ODA after initially rejecting PVC as material has reviewed its decision and develop a policy for the use of PVC. The PVC policy has focused attention on the use of PVC across the project and highlighted that the functional properties of PVC make it the most appropriate material in certain circumstances. Environmental and social impacts across the whole life cycle played an important role, with e.g. the rate for recycling or re-use and the percentage of recycled content.
Read more about this topic: Polyvinyl Chloride