Implementation
As a rule pipelines for all uses are laid in most cases underground. However in some cases it is necessary to cross a valley or a river on a pipeline bridge. Pipelines for centralized heating systems are often laid on the ground or overhead. Pipelines for petroleum running through permafrost areas as Trans-Alaska-Pipeline are often run overhead in order to avoid melting the frozen ground by hot petroleum which would result in sinking the pipeline in the ground.
Read more about this topic: Pipeline Transport