Piccadilly Line - Future Upgrades

Future Upgrades

The Piccadilly line is to be upgraded by a date yet to be announced. This will involve new trains as well as new signalling, increasing the line's capacity by some 24% and reducing journey times by one fifth. Bids for new rolling stock were originally submitted in 2008. However, after the acquisition of Tube Lines by Transport for London in June 2010, this order was cancelled and the upgrade postponed.

LUL has invited Alstom, Bombardier and Siemens to develop a new concept of lightweight, low-energy, semi-articulated train for the deep-level lines, provisionally called "Evo" (for 'evolution'). So far only Siemens has publicised an outline design, which would feature air-conditioning and would also have battery power enabling the train to run on to the next station if third and fourth rail power were lost. It would have a lower floor and 11% higher passenger capacity than the present tube stock. There would be a weight saving of 30 tonnes, and the trains would be 17% more energy-efficient with air-conditioning included, or 30% more energy-efficient without it. The intention is that these new trains would eventually operate on the Bakerloo, Central, Piccadilly and Waterloo & City lines.

There are also some proposals, predominantly by Slough Council to extend the line towards Staines railway station from Heathrow Terminal 5 station. A number of routes have been proposed, and the main ones pass very close to but do not call at Windsor.

Read more about this topic:  Piccadilly Line

Famous quotes containing the word future:

    Whoever influences the child’s life ought to try to give him a positive view of himself and of his world. The child’s future happiness and his ability to cope with life and relate to others will depend on it.
    Bruno Bettelheim (20th century)