Current Airport Improvement Activity
Current development at the airport includes a new multi-level building which will connect Terminals D and E, a 50,000 sq ft (4,600 m2) addition to the Terminal E concourse, a 9,000 sq ft (840 m2) connector building between Baggage Claims D and E, renovations to interior areas of the two terminals and the adjacent heating and cooling facility.
Phases 1A and 1B involved a new multi-level building connecting Terminals D and E. The first level houses a new baggage make-up area and will replaces the existing areas in each terminal. This area also contains an Explosive Detection System (EDS), to be operated by the TSA as part of an in-line baggage screening system. Level two houses a 14-lane passenger security screening area serving both terminals, and the third level houses Division of Aviation offices and with space for an airline club. The Phase 1A entailed site work, constructing building foundations, utility relocation and structural steel placement for the connector building. Work on Phase IB commenced in July 2007 with the completed building opening in February 2010.
Modifications within existing D and E buildings included 23 additional ticket counter positions with expanded areas for queuing and public circulation, new concessions and other tenant spaces. The Terminal E Concourse was expanded with the construction of a 2-level addition at the end of the concourse. Airline Operations space are at ground level while the second level provides hold rooms, passenger amenities and space for three new gates and four relocated gates. The bag claim buildings for Terminals D & E are connected with a one story addition that contains two additional baggage carousels.
Read more about this topic: Philadelphia International Airport
Famous quotes containing the words current, airport, improvement and/or activity:
“It is a quite remarkable fact that the great religions of the most civilized peoples are more deeply fraught with sadness than the simpler beliefs of earlier societies. This certainly does not mean that the current of pessimism is eventually to submerge the other, but it proves that it does not lose ground and that it does not seem destined to disappear.”
—Emile Durkheim (18581917)
“Airplanes are invariably scheduled to depart at such times as 7:54, 9:21 or 11:37. This extreme specificity has the effect on the novice of instilling in him the twin beliefs that he will be arriving at 10:08, 1:43 or 4:22, and that he should get to the airport on time. These beliefs are not only erroneous but actually unhealthy.”
—Fran Lebowitz (b. 1950)
“They act as if they supposed that to be very sanguine about the general improvement of mankind is a virtue that relieves them from taking trouble about any improvement in particular.”
—John Morley [1st Viscount Morley Of Blackburn] (18381923)
“In communist society, where nobody has one exclusive sphere of activity but each can become accomplished in any branch he wishes, society regulates the general production and thus makes it possible for me to do one thing today and another tomorrow, to hunt in the morning, fish in the afternoon, rear cattle in the evening, criticize after dinner, just as I have a mind, without ever becoming hunter, fisherman, shepherd or critic.”
—Karl Marx (18181883)