Technical Description
The Ormen Lange field has been developed without using conventional offshore platforms. Instead, 24 subsea wellheads in four seabed templates on the ocean floor are connected directly by two 30 inches (762 mm) pipelines to an onshore process terminal at Nyhamna. After processing, the gas is exported by the world's second longest subsea gas pipeline - Langeled pipeline - approximately 1,200 kilometres (750 mi) from Nyhamna to Easington in England. The northern section of the export pipeline has a diameter of 42 inches (1,067 mm), and the section from Sleipner to Easington has a diameter of 44 inches (1,118 mm). The field produces 70 million cubic meters of natural gas per day.
Total cost is estimated to reach 66 billion Norwegian kroner (around US$12 billion) by the time of completion.
Read more about this topic: Ormen Lange (gas Field)
Famous quotes containing the words technical and/or description:
“The best work of artists in any age is the work of innocence liberated by technical knowledge. The laboratory experiments that led to the theory of pure color equipped the impressionists to paint nature as if it had only just been created.”
—Nancy Hale (b. 1908)
“He hath achieved a maid
That paragons description and wild fame;
One that excels the quirks of blazoning pens.”
—William Shakespeare (15641616)