Oregon Route 99E Business - Future

Future

The Oregon Department of Transportation (ODOT) and the City of Salem are considering building an additional bridge across the Willamette River, north of the current Marion and Center Street bridges (which carry OR 22 across the river, and are the only river crossings for motor vehicles in the city). The exact location and alignment of this proposed new bridge and its connecting routes is presently under study, but generally, the routes being considered would connect to OR 99E Business at or near the southern end of the Salem Parkway on the river's eastern shore, and provide access to both OR 22 and Oregon Route 221 on the western side. Such a route would be similar to that proposed for I-305.

Read more about this topic:  Oregon Route 99E Business

Famous quotes containing the word future:

    “I am succeeding quite well in my work and the future looks well. What special mission is God preparing me for? Cutting off all earthly ties and isolating me as it were.”
    —Ellen Henrietta Swallow Richards (1842–1911)

    “The future is built on brains, not prom court, as most people can tell you after attending their high school reunion. But you’d never know it by talking to kids or listening to the messages they get from the culture and even from their schools.”
    —Anna Quindlen (b. 1953)

    “The present hour is always wealthiest when it is poorer than the future ones, as that is the pleasantest site which affords the pleasantest prospects.”
    —Henry David Thoreau (1817–1862)