Ohio-class Submarine - Replacement

Replacement

The Department of Defense anticipates a continued need for a sea-based strategic nuclear force. The first of the current Ohio SSBNs are expected to be retired by 2029, meaning that a platform must already be seaworthy by that time. A replacement may cost over $4 billion per unit compared to Ohio's $2 billion. The Navy is exploring two options. The first is a variant of the Virginia-class nuclear attack submarines. The second is a dedicated SSBN, either with a new hull or based on an overhaul of the current Ohio.

With the cooperation of both Electric Boat and Newport News Shipbuilding, in 2007 the Navy already begun a cost control study. Then in December 2008 the Navy awarded Electric Boat a contract for the missile compartment design of the Ohio-class replacement, worth up to $592 million. Newport News is expected to receive close to 4% of that project. The Navy has yet to confirm an Ohio-class replacement program. But in April 2009 Defense Secretary Robert M. Gates confirmed that the Navy should begin such a program in 2010. The new vessel is scheduled to enter the design phase by 2014. It is anticipated that, if a new hull design is used, the program must be initiated by 2016 in order to meet the 2029 deadline.

Representative Gene Taylor of Mississippi had threatened to block the project unless the Navy shares with the Congress an internal Analysis of Alternatives.

Read more about this topic:  Ohio-class Submarine

Famous quotes containing the word replacement:

    Not even the visionary or mystical experience ever lasts very long. It is for art to capture that experience, to offer it to, in the case of literature, its readers; to be, for a secular, materialist culture, some sort of replacement for what the love of god offers in the world of faith.
    Salman Rushdie (b. 1947)