Modernization Plan
O'Hare's high volume and crowded schedule can lead to long delays and cancellations that, due to the airport being a major hub, can affect air travel across North America. Official reports rank O'Hare as one of the least punctual airports in the United States based on percentage of delayed flights. In 2004, United Airlines and American Airlines agreed to modify their schedules to help reduce congestion caused by clustered arrivals and departures. Because of the air traffic departing, arriving, and near the airport, air traffic controllers at O'Hare and its nearby facilities are among the leaders in the world in terms of number of controlled flights per hour.
City management has committed to a $6 billion capital investment plan to increase the airport's capacity by 60% and decrease delays by an estimated 79 percent. This plan was approved by the FAA in October 2005 and will involve a reconfiguration of the airfield and addition of terminal space. The plan includes the addition of four runways, the lengthening of two existing runways, and the decommissioning of two existing runways in order to give the airfield six parallel runways in a configuration similar to that in Dallas and other large modern hub airports. This plan was very controversial as the added improvements, at the time they were proposed, were expected to increase the airport's air traffic capacity only slightly, given existing FAA rules. Additionally, the southernmost new runway would require the city acquire additional land, which was extremely controversial as residents did not want to move.
The Modernization Plan is now being implemented; an additional runway and Air Traffic Control Tower were commissioned on November 20, 2008. The new north runway, designated 9L/27R, initially served as a foul weather arrival runway, addressing one of O'Hare's primary causes of delay, but now serves as one of three runways that can be used simultaneously for landings. An extension of Runway 10/28 (formerly 9R/27L) to 13,001 feet (3,963 m) was opened in September, 2008, facilitating the shortening and eventual closure of the 13,000 feet (4,000 m) Runway 14R/32L. At the same time, the FAA redesigned departure routes for both O'Hare and Chicago Midway International Airport, increasing the number from three shared by both airports to five from each airport. With the new runway's opening, O'Hare's maximum aircraft arrival capacity increased from 96 planes per hour to 112 planes per hour; United Airlines's senior vice president of operations, Joseph Kolshak, told The Wall Street Journal that within a month of the runway's opening, "they were consistently hitting that."
As part of Mayor Rahm Emanuel's $7.3 billion infrastructure modernization plan, announced in March 2012, the airport would receive an additional $1.4 billion over three years to hasten the completion of the modernization effort. The plan calls for accelerated completion of the fourth and final new runway as well as resumed negotiations with the airport's major airlines in an effort to boost O'Hare's overall capacity by 300,000 passengers per year by 2015.
The modernization plan has required the acquisition of 126 acres (51 ha) of land in Des Plaines, Illinois; construction of runway 27R and the control tower cost $457 million and involved the rerouting of a creek and 14,000,000 cubic yards (11,000,000 m3) of fill to build up an embankment.." 2,800 residents had to be relocated, as well as a cemetery with 900 known graves. The program ultimately is expected to expand the airport's capacity to over 3,800 operations per day, up from the present capacity of 2,700, and will vastly increase passenger throughput. It will also improve the ability of very large aircraft such as the A380 to operate.
Flight caps in place since 2004 expired on October 31, 2008. Ironically, American Airlines eliminated over 60 daily flights at O'Hare because of soaring fuel prices. United announced similar cutbacks. Recent worldwide economic difficulties further complicate the forecasts for airport demand.
After initially opposing the Modernization plan, DuPage County has endorsed the plan citing the creation of jobs, commercial development, and the ability of O'Hare to regain the status as busiest airport.
United Airlines will invest in additional upgrades to the airport. $13m is to be spent on new passenger loading bridges at Terminal 2, due for completion in 2013. Other upgrades will include an extra $10m United Club in terminal 2, security updates and a medical centre for United Airlines personnel.
existing runway new runway removed runway-
Phase 1 (Complete)
-
Phase 2 (Extension complete, runway 14R/32L shortened to 9,685 feet (complete), future runway 10C/28C under construction)
-
Phase 3 (Beginning stages)
-
Final runway configuration
Read more about this topic: O'Hare International Airport
Famous quotes containing the word plan:
“I have always thought that one man of tolerable abilities may work great changes, and accomplish great affairs among mankind, if he first forms a good plan, and, cutting off all amusements or other employments that would divert his attention, make the execution of that same plan his sole study and business.”
—Benjamin Franklin (17061790)