Workshop
Bow railway works was built in 1853 and also had a sizeable wagon repair shop. When the railway was merged into the LMS it was the smallest of fifteen workshops. It not only repaired NLR locomotives but, from 1927 those from the former London, Tilbury and Southend Railway (LTSR).
In the 1930s the works developed and manufactured the Hudd automatic control system for the LTSR, which later on led to a British Rail (BR) team from the national headquarters setting up in Bow to develop BR's standard Automatic Warning System. The workshop was badly damaged during the blitz and the wagon workshop destroyed.
In 1956 the workshop repaired diesel-electric locomotives for the motive power depot at Devons Road (the first to become all-diesel). After a while it was receiving locos in the morning and turning them round by the evening, which initially confused the statistical returns since locos were entering and leaving the works on the same day. The works closed down in 1960.
Read more about this topic: North London Railway
Famous quotes containing the word workshop:
“Had I made capital on my prettiness, I should have closed the doors of public employment to women for many a year, by the very means which now makes them weak, underpaid competitors in the great workshop of the world.”
—Jane Grey Swisshelm (18151884)