Nord Stream - History

History

The original pipeline project started in 1997 when Gazprom and the Finnish company Neste (in 1998 merged with Imatran Voima to form Fortum, and 2004 separated again) formed the joint company North Transgas Oy for construction and operation of a gas pipeline from Russia to Northern Germany across the Baltic Sea. North Transgas cooperated with the German gas company Ruhrgas (became later part of E.ON). A route survey in the Exclusive Economic Zones of Finland, Sweden, Denmark and Germany, and a feasibility study of the pipeline was conducted in 1998. Several routes were considered including routes with onshore segments through Finland and Sweden.

On 24 April 2001, Gazprom, Fortum, Ruhrgas and Wintershall adopted a statement regarding a joint feasibility study for construction of the pipeline. On 18 November 2002, the Management Committee of Gazprom approved a schedule of project implementation. In May 2005, Fortum withdrew from the project and sold its stake in North Transgas to Gazprom. As a result, Gazprom became the only shareholder of North Transgas Oy.

On 8 September 2005, Gazprom, BASF and E.ON signed a basic agreement on the construction of a North European Gas Pipeline. On 30 November 2005, the North European Gas Pipeline Company (later renamed Nord Stream AG) was incorporated in Zug, Switzerland. On 9 December 2005, Gazprom started construction of the Russian onshore feeding pipeline. On 4 October 2006, the pipeline and the operating company were officially renamed Nord Stream AG. After establishment of Nord Stream AG, all information related to the pipeline project, including results of the seabed survey of 1998, were transferred from North Transgas to the new company, and on 2 November 2006, North Transgas was officially dissolved.

The environmental impact assessment started on 16 November 2006 with notification sent to Russia, Finland, Sweden, Denmark and Germany, as parties of origin (the countries whose exclusive economic zones and/or territorial waters the pipeline is planned to pass through), as well as to Poland, Latvia, Lithuania, and Estonia as affected parties. The final report on transboundary environmental impact assessment was delivered on 9 March 2009.

On 19 March 2007, Nord Stream AG mandated Italian company Snamprogetti, a subsidiary of Saipem, for detailed design engineering of the pipeline. A letter of intent for construction works was signed with Saipem on 17 September 2007 and the contract was concluded on 24 June 2008. On 25 September 2007, the pipe supply contracts were awarded to the pipe producers EUROPIPE and OMK, and on 18 February 2008, the concrete weight coating and logistics services agreement was awarded to EUPEC PipeCoatings S.A. The supply contracts for the second line were awarded to OMK, Europipe and Sumitomo Heavy Industries on 22 January 2010. On 30 December 2008 Rolls-Royce plc was awarded a contract to supply gas turbines driving centrifugal compressors and on 8 January 2009, Royal Boskalis Westminster and Tideway were awarded a joint venture seabed dredging contract.

The agreement to take N.V. Nederlandse Gasunie to the consortium as the fourth partner, was signed on 6 November 2007. On 10 June 2008, Gasunie was included in the register of shareholders. On 1 March 2010, French energy company GDF Suez signed with Gazprom a memorandum of understanding to acquire 9% stake in the project. The transaction was closed in July 2010.

In August 2008, Nord Stream AG hired former Finnish prime minister Paavo Lipponen as a consultant to help speed up the application process in Finland and to serve as a link between Nord Stream and Finnish authorities.

On 21 December 2007, Nord Stream AG submitted application documents to the Swedish government for the pipeline construction in the Swedish Exclusive Economic Zone. On 12 February 2008, the Swedish government rejected the consortium's application which it had found incomplete. New application was filed later. On 20 October 2009, Nord Stream received a construction permit to build the pipeline in the Danish waters. On 5 November 2009, the Swedish and Finnish authorities gave a permit to lay the pipeline in their exclusive economic zones. On 22 February 2010, the Regional State Administrative Agency for Southern Finland issued the final environmental permit allowing construction of the Finnish section of the pipeline.

On 15 January 2010 construction of the Portovaya compressor station in Vyborg near the Gulf of Finland began. The first pipe of the pipeline was laid on 6 April 2010 in the Swedish exclusive economic zone by the Castoro Sei vessel. In addition to Castoro Sei, also Castoro 10 and Solitaire were contracted for pipe-laying works. Construction of the pipeline was officially launched on 9 April 2010 at Portovaya Bay.

The laying of the first line was completed on 4 May 2011 (the last pipe put in place), while all underwater works on the first line were completed on 21 June 2011. In August 2011, Nord Stream was connected with the OPAL pipeline. First gas was pumped into the first line on 6 September 2011.

The pipeline was officially inaugurated by the German Chancellor Angela Merkel, Russian President Dmitry Medvedev and French Prime Minister François Fillon on 8 November 2011 at the ceremony held in Lubmin. Initially, the pipeline was able to deliver 27.5 billion cubic metres (970 billion cubic feet) of gas annually, but this capacity was doubled once the second pipeline was finished. Construction of the second line was completed in August 2012 and it was inaugurated on 8 October 2012.

In August 2012, Nord Stream AG applied to Finnish and Estonian governments for route studies in their exclusive economic zones for the third and fourth lines.

Read more about this topic:  Nord Stream

Famous quotes containing the word history:

    The visual is sorely undervalued in modern scholarship. Art history has attained only a fraction of the conceptual sophistication of literary criticism.... Drunk with self-love, criticism has hugely overestimated the centrality of language to western culture. It has failed to see the electrifying sign language of images.
    Camille Paglia (b. 1947)

    The one duty we owe to history is to rewrite it.
    Oscar Wilde (1854–1900)

    Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.
    William Faulkner (1897–1962)