New River Gorge Bridge - History

History

Construction began on the bridge in June 1974, and completed on October 22, 1977. It was designed by the Michael Baker Company, under the direction of Chief Engineer Clarence V. Knudsen, and executed by U.S. Steel's American Bridge Division. Final cost of construction was $37 million (approximately $4 million over bid). It is made from COR-TEN steel. The use of COR-TEN in construction presented several challenges; notable among them was ensuring that the weld-points weathered at the same rate as the rest of the steel.

Completion of the bridge cut the travel time from one side of the gorge to the other from about 45 minutes to 45 seconds.

Read more about this topic:  New River Gorge Bridge

Famous quotes containing the word history:

    The history of the Victorian Age will never be written: we know too much about it.
    Lytton Strachey (1880–1932)

    The history of his present majesty, is a history of unremitting injuries and usurpations ... all of which have in direct object the establishment of an absolute tyranny over these states. To prove this, let facts be submitted to a candid world, for the truth of which we pledge a faith yet unsullied by falsehood.
    Thomas Jefferson (1743–1826)

    ... the history of the race, from infancy through its stages of barbarism, heathenism, civilization, and Christianity, is a process of suffering, as the lower principles of humanity are gradually subjected to the higher.
    Catherine E. Beecher (1800–1878)