Route Data
- Operators and route length:
- JR Kyushu (services and tracks)
- Tosu - Nagasaki: 125.3 km (77.86 mi)
- Kikitsu - Nagayo - Urakami: 23.5 km (14.60 mi)
- JR Freight (services)
- Tosu - Nagasaki: 125.3 km (77.86 mi)
- JR Kyushu (services and tracks)
- Stations: 41 (including seasonal stations)
- Double-tracking:
- Tosu - Hizen-Yamaguchi
- Isahaya - Kikitsu
- Urakami - Nagasaki
- Electrification: Tosu - Nagasaki (20kV AC 60 Hz)
- Railway signalling: Automatic
- CTC center: Hakata Integrated Operations Center
Read more about this topic: Nagasaki Main Line
Famous quotes containing the words route and/or data:
“But however the forms of family life have changed and the number expanded, the role of the family has remained constant and it continues to be the major institution through which children pass en route to adulthood.”
—Bernice Weissbourd (20th century)
“This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.”
—Susan Sontag (b. 1933)
Related Phrases
Related Words