Montserrat Rack Railway - Equipment

Equipment

The line's most significant engineering work is the Pont del Centenari bridge, which is 480 m (1,575 ft) long and 5 m (16 ft 4.9 in) wide, crossing the River Llobregat. Its nine sections are between 35 m (115 ft) and 55 m (180 ft) long and it was designed as a lattice of steel tubes to give it a light appearance and minimise its visual impact. It is supported by eight pillars with maximum height of 37 m (121 ft).

The line is operated by five low-floor electric motor coaches of type Stadler GTW, built by Stadler Rail in Switzerland. The cars are numbered AM1-AM5 and named after local peaks. These cars are equipped for adhesion and rack propulsion and can each carry up to 200 passengers. They are air-conditioned and have panorama windows offering a good view over the environment. Trains run at up to 30 km/h (18.6 mph) on the rack section and 45 km/h (28.0 mph) on the adhesion section. The line also has a 1930 built electric locomotive, E4, transferred from the Vall de NĂºria Rack Railway for use on works trains.

Read more about this topic:  Montserrat Rack Railway

Famous quotes containing the word equipment:

    Biological possibility and desire are not the same as biological need. Women have childbearing equipment. For them to choose not to use the equipment is no more blocking what is instinctive than it is for a man who, muscles or no, chooses not to be a weightlifter.
    Betty Rollin (b. 1936)

    Pop artists deal with the lowly trivia of possessions and equipment that the present generation is lugging along with it on its safari into the future.
    —J.G. (James Graham)

    Dr. Scofield’s equipment, which you have just seen, radiated waves direct to Professor Houghland’s laboratory. When these waves came in contact with those the professor’s equipment was radiating, they created the interstellar frequency, which is the death ray.
    Joseph O’Donnell, and Clifford Sanforth. Arthur Perry (Bela Lugosi)