When the Expo Line opened in 1985, an extension to Lougheed Mall in east Burnaby was proposed. The most likely junction point for the spur to Lougheed Mall would have been from Royal Oak Station, up Edmonds Street to Lougheed Mall, although early SkyTrain route maps also suggested an extension northeast from New Westminster. Neither plan was ever realized, although the extension of Expo Line tracks to Columbia Station in 1989 and the completion of the Skybridge to Surrey in 1988 resulted in a short spur east of Columbia Station, which was ultimately incorporated into the new Millennium Line.

In the late 1990s, the British Columbia government announced that an entirely new line would be built from VCC–Clark Station to Columbia Station via Lougheed Mall (served by Lougheed Town Centre Station), as the first phase of the "T-Line" outlined in the GVRD's Livable Region Strategic Plan that extended into Coquitlam. The government's choice of Bombardier's technology meant that the first phase of the line would have to connect to the existing Expo Line to use its maintenance yard. Connecting the two lines at Broadway Station was deemed too impracticable, so the lines were connected in New Westminster. Switches to the Millennium Line were installed on the Expo Line at the north end of the Skybridge. Expo Line service was reduced to a single track over the Skybridge during the installation of these switches.

The second phase of the Millennium Line was to be an extension from Lougheed Mall to Coquitlam (then known as the Port Moody-Coquitlam (PMC) Line), which would have provided a "one seat ride" from Coquitlam to VCC–Clark Station. Switches to the PMC Line were installed to the east of Lougheed Town Centre Station and a third platform was roughed-in in anticipation of the extension. Phase II was cancelled following a change in provincial government.

The Millennium Line opened on January 2, 2002, with trains initially operating between Waterfront Station on the Expo Line and Braid Station in eastern New Westminster - this was referred to as Phase I. Service was extended to Commercial–Broadway Station (then 'Commercial Drive Station'), or Phase II of construction, on September 4, 2002. Lake City Way Station opened on November 21, 2003. Three years later, the line was extended to its present terminus, VCC–Clark Station, opening on January 6, 2006.

Millennium Line trains follow the Expo Line from Waterfront to Columbia Stations, then loop back into Vancouver via a new route, passing through Commercial–Broadway Station again at a different platform, and terminating at VCC–Clark Station.

In 2007, the non-interlined portion of the Millennium Line served an average of 70,000 passengers per day. Of these, 14,000 passengers arrived on trains travelling from Expo Line stations west of Columbia Station, and 7,000 transferred from the Surrey section of the Expo Line. Since then, it is estimated that ridership has grown to at least 80,000 passengers per day.

Read more about this topic:  Millennium Line

Famous quotes containing the word history:

    The history of mankind interests us only as it exhibits a steady gain of truth and right, in the incessant conflict which it records between the material and the moral nature.
    Ralph Waldo Emerson (1803–1882)

    History, as an entirety, could only exist in the eyes of an observer outside it and outside the world. History only exists, in the final analysis, for God.
    Albert Camus (1913–1960)

    The history of the world is none other than the progress of the consciousness of freedom.
    Georg Wilhelm Friedrich Hegel (1770–1831)