Material Requirements Planning - Solutions To Data Integrity Issues

Solutions To Data Integrity Issues

Bill of material - The best practice is to physically verify the bill of material either at the production site or by un-assembling the product.

Cycle count - The best practice is to determine why a cycle count that increases or decreases inventory has occurred. Find the root cause and correct the problem from occurring again.

Scrap reporting - This can be the most difficult area to maintain with any integrity. Start with isolating the scrap by providing scrap bins at the production site and then record the scrap from the bins on a daily basis. One benefit of reviewing the scrap on site is that preventive action can be taken by the engineering group.

Receiving errors - Manual systems of recording what has been received are error prone. The best practice is to implement the system of receiving by ASN from the supplier. The supplier sends an ASN (Advanced Shipping Notification). When the components are received into the facility, the ASN is processed and then company labels are created for each line item. The labels are affixed to each container and then scanned into the MRP system. Extra labels reveal a shortage from the shipment and too few labels reveal an over shipment. Some companies pay for ASN by reducing the time in processing accounts payable.

Shipping Errors - The container labels are printed from the shipper. The labels are affixed to the containers in a staging area or when they are loaded on the transport.

Production reporting - The best practice is to use bar code scanning to enter production into inventory. A product that is rejected should be moved to an MRB (material review board) location. Containers that require sorting need to be received in reverse.

Replenishment - The best replenishment practice is replacement using bar code scanning, or via pull system. Depending upon the complexity of the product, planners can actually order materials using scanning with a min-max system.

Read more about this topic:  Material Requirements Planning

Famous quotes containing the words solutions to, solutions, data, integrity and/or issues:

    Those great ideas which come to you in your sleep just before you awake in morning, those solutions to the world’s problems which, in the light of day, turn out to be duds of the puniest order, couldn’t they be put to some use, after all?
    Robert Benchley (1889–1945)

    The anorexic prefigures this culture in rather a poetic fashion by trying to keep it at bay. He refuses lack. He says: I lack nothing, therefore I shall not eat. With the overweight person, it is the opposite: he refuses fullness, repletion. He says, I lack everything, so I will eat anything at all. The anorexic staves off lack by emptiness, the overweight person staves off fullness by excess. Both are homeopathic final solutions, solutions by extermination.
    Jean Baudrillard (b. 1929)

    To write it, it took three months; to conceive it three minutes; to collect the data in it—all my life.
    F. Scott Fitzgerald (1896–1940)

    I’m no idealist to believe firmly in the integrity of our courts and in the jury system—that is no ideal to me, it is a living, working reality. Gentlemen, a court is no better than each man of you sitting before me on this jury. A court is only as sound as its jury, and a jury is only as sound as the men who make it up.
    Harper Lee (b. 1926)

    The hard truth is that what may be acceptable in elite culture may not be acceptable in mass culture, that tastes which pose only innocent ethical issues as the property of a minority become corrupting when they become more established. Taste is context, and the context has changed.
    Susan Sontag (b. 1933)