History
Prior to MRP, and before computers dominated industry, reorder-point/reorder-quantity (ROP/ROQ) type methods like EOQ (Economic Order Quantity) had been used in manufacturing and inventory management. In 1964, Joseph Orlicky as a response to the TOYOTA Manufacturing Program, developed Material Requirements Planning (MRP). First company to use MRP was Black & Decker in 1964, with Dick Alban as project leader. In 1983 Oliver Wight developed MRP into manufacturing resource planning (MRP II). Orlicky's book is entitled The New Way of Life in Production and Inventory Management (1975). By 1975, MRP was implemented in 150 companies. This number had grown to about 8,000 by 1981. In the 1980s, Joe Orlicky's MRP evolved into Oliver Wight's manufacturing resource planning (MRP II) which brings master scheduling, rough-cut capacity planning, capacity requirements planning, S&OP in 1983 and other concepts to classical MRP. By 1989, about one third of the software industry was MRP II software sold to American industry ($1.2 billion worth of software).
Read more about this topic: Material Requirements Planning
Famous quotes containing the word history:
“As I am, so shall I associate, and so shall I act; Caesars history will paint out Caesar.”
—Ralph Waldo Emerson (18031882)
“Anyone who is practically acquainted with scientific work is aware that those who refuse to go beyond fact rarely get as far as fact; and anyone who has studied the history of science knows that almost every great step therein has been made by the anticipation of Nature.”
—Thomas Henry Huxley (182595)
“Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.”
—Ruth Benedict (18871948)