Massachusetts Route 128 - Route 128 Corridor Study

Route 128 Corridor Study

The Boston area MPO studied the Route 128/I-95 Corridor from approximately 2005–2010. The study focused on the heavily congested section from I-90 (Newton) to US 3 (Burlington), and was completed in November 2010. As of 2010, the highway carried over 200,000 vehicles per day. Some possible improvements to Route 128 include HOV or HOT Lanes, reconstruction of shoulders, ramp metering, bus on shoulder, and fiber optic traffic system improvements. More studies will need to be completed before projects will begin.

Read more about this topic:  Massachusetts Route 128

Famous quotes containing the words route, corridor and/or study:

    By a route obscure and lonely,
    Haunted by ill angels only,
    Where an eidolon, named Night,
    On a black throne reigns upright,
    I have reached these lands but newly
    From an ultimate dim Thule—
    From a wild weird clime that lieth, sublime,
    Out of space—out of time.
    Edgar Allan Poe (1809–1849)

    And now in one hour’s time I’ll be out there again. I’ll raise my eyes and look down that corridor four feet wide with ten lonely seconds to justify my whole existence.
    Colin Welland (b. 1934)

    I have always thought that one man of tolerable abilities may work great changes, and accomplish great affairs among mankind, if he first forms a good plan, and, cutting off all amusements or other employments that would divert his attention, make the execution of that same plan his sole study and business.
    Benjamin Franklin (1706–1790)