MHP was constructed at a cost of C$278 m, or $400 per square foot. This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly. The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher water table than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Read more about this topic: Manitoba Hydro Place
Famous quotes containing the word cost:
“Every new stroke of civilization has cost the lives of countless brave men, who have fallen defeated by the dragon, in their efforts to win the apples of the Hesperides, or the fleece of gold. Fallen in their efforts to overcome the old, half sordid savagery of the lower stages of creation, and win the next stage.”
—D.H. (David Herbert)
“To call a posit a posit is not to patronize it. A posit can be unavoidable except at the cost of other no less artificial expedients. Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built.”
—Willard Van Orman Quine (b. 1908)
“[M]y conception of liberty does not permit an individual citizen or a group of citizens to commit acts of depredation against nature in such a way as to harm their neighbors and especially to harm the future generations of Americans. If many years ago we had had the necessary knowledge, and especially the necessary willingness on the part of the Federal Government, we would have saved a sum, a sum of money which has cost the taxpayers of America two billion dollars.”
—Franklin D. Roosevelt (18821945)