The Litani River Authority
The Litani River Authority (LRA) was formed in 1954 to facilitate the integrated development of the Litani River Basin. Shortly after its formation, the LRA engaged in a massive hydroelectric development project that tapped the 850 meter head potential between Lake Qaraoun and the Mediterranean. This development has brought about major hydrological changes to the Litani River Basin, where the flows from its upper reaches above Lake Qaraoun, referred to as the Upper Litani Basin (ULB), are diverted through a system of tunnels, ponds and plants, to meet the Mediterranean several kilometers north of its original natural tailwater. These changes have resulted in the effective hydrological separation between the ULB and the Litani lower reaches.The advent of a protracted civil strife in the 1970s followed by a prolonged occupation in the 1980s that lasted into the 1990s, have plunged the country into disarray, freezing development and investment in infrastructure. The subsequent return to normal conditions has encouraged the LRA to initiate several major water diversion projects from the ULB worth hundreds of millions of US dollars.
Read more about this topic: Litani River
Famous quotes containing the words river and/or authority:
“but we wish the river had another shore,
some further range of delectable mountains,”
—Robert Lowell (19171977)
“Death is the sanction of everything the story-teller can tell. He has borrowed his authority from death.”
—Walter Benjamin (18921940)