See also: List of megaprojectsWith a budget of 7.5 billion euros (approx. $9bn or £6.19bn as of Jun 2010), the LHC is one of the most expensive scientific instruments ever built. The total cost of the project is expected to be of the order of 4.6bn Swiss francs (approx. $4.4bn, €3.1bn, or £2.8bn as of Jan 2010) for the accelerator and SFr 1.16bn (approx. $1.1bn, €0.8bn, or £0.7bn as of Jan 2010) for the CERN contribution to the experiments.
The construction of LHC was approved in 1995 with a budget of SFr 2.6bn, with another SFr 210M towards the experiments. However, cost overruns, estimated in a major review in 2001 at around SFr 480M for the accelerator, and SFr 50M for the experiments, along with a reduction in CERN's budget, pushed the completion date from 2005 to April 2007. The superconducting magnets were responsible for SFr 180M of the cost increase. There were also further costs and delays due to engineering difficulties encountered while building the underground cavern for the Compact Muon Solenoid, and also due to faulty parts provided by Fermilab. Due to lower electricity costs during the summer, it is expected that the LHC will normally not operate over the winter months, although an exception was made to make up for the 2008 start-up delays over the 2009/10 winter.
Read more about this topic: Large Hadron Collider
Famous quotes containing the word cost:
“Keeping accounts, Sir, is of no use when a man is spending his own money, and has nobody to whom he is to account. You wont eat less beef today, because you have written down what it cost yesterday.”
—Samuel Johnson (17091784)
“One must always be aware, to noticeeven though the cost of noticing is to become responsible.”
—Thylias Moss, African American poet. As quoted in the Wall Street Journal (May 12, 1994)
“This people must cease to hold slaves, and to make war on Mexico, though it cost them their existence as a people.”
—Henry David Thoreau (18171862)