Construction
While Voroshilov was laid down first, Kirov was the prototype for the class and was completed first. Her trials were a disappointment as her Italian-built turbines initially had minor defects and she was a knot slower than guaranteed. The Italians pointed out that the guarantee only applied if she displaced 7200 tonnes or less, and she was overweight by over 500 tonnes (490 long tons; 550 short tons). Her turrets had numerous teething problems and inflicted more blast damage than anticipated, which showed that her welding plan had not been followed. Her firing arcs were reduced in an attempt to mitigate the problem. Voroshilov's Soviet-built turbines were more powerful than anticipated and she almost achieved her design speed.
Components for the Project 26bis2 ships were manufactured in the West (Ordzhonikidze built those for Kalinin and Marti those for Kaganovich) and shipped to Komsomolsk-on-Amur for assembly. They were launched from drydocks and towed incomplete to Vladivostok for fitting-out.
Read more about this topic: Kirov Class Cruiser
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)