King Abdulaziz International Airport - New King Abdulaziz International Airport Project

New King Abdulaziz International Airport Project

The new development is taking place in three stages starting in September 2006, and currently scheduled for completion in 2015. Three new terminal buildings, a high-speed rail link and a capacity for up to 80 million passengers a year are among the targets proposed for a new airport. The project is designed to increase the airport’s capacity initially from 13 million passengers by 30 million passengers each year. The expansion includes airfield hard standing and paved areas, lighting, fuel network systems and storm water drainage network. There will also be a newly constructed support services building, renovation of the existing South and North Terminals and upgrades to the existing runway and airfield systems to accommodate the Airbus A380. The three stages, according to GACA – the General Authority of Civil Aviation of Saudi Arabia, will be marked by staged capacity increase to 30mn / 60mn and 80mn passengers per year. Based on current traffic increases, the existing South Terminal will need to serve about 21 million passengers per year over the next 20 years to meet growing demand. The project has reached the final stages of planning and design, and King Abdullah, the Custodian of the Two Holy Mosques has approved a budget of SR4 billion to build the futuristic new airport to international standards. Abdullah Al-Rehaimy, president of the General Authority of Civil Aviation, has said that the project will be built by local companies. The three new crescent-shaped passenger halls will be located to the south of the current international terminal which will be undergoing renovation at the same time. Talal Saaty, speaking at a presentation of the project to Jeddah Governor Prince Mishaal ibn Majed, said that work on the improvements could start as early as this coming September. Operational capacity for the airport, he said, would increase, and denied that upgrading work would hamper traffic throughput. Work on renewing and upgrading the facilities, he said, would be timed to avoid peak traffic flow. Access to the new terminals is still in the planning and purchasing stage. An extension of Prince Majed Street will make access diregjfd ngkj nry5 hgjt l;htmn5yn m of the compulsory purchase of property and compensation. Southward, Prince Majed Street will connect to the Al-Laith Highway, forming a fast north-south transit route. As well as much improved road access, plans have been made for a high-speed rail link serving the airport. Starting at Prince Majed Street, the link will run into the airport and hook up with terminals

Read more about this topic:  King Abdulaziz International Airport

Famous quotes containing the words king, airport and/or project:

    The King himself is to be feared as the lion.
    William Shakespeare (1564–1616)

    Airplanes are invariably scheduled to depart at such times as 7:54, 9:21 or 11:37. This extreme specificity has the effect on the novice of instilling in him the twin beliefs that he will be arriving at 10:08, 1:43 or 4:22, and that he should get to the airport on time. These beliefs are not only erroneous but actually unhealthy.
    Fran Lebowitz (b. 1950)

    Oh Death he is a little man,
    And he goes from do’ to do’ ...
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)