Crises of 2007
A proposal for water supply to Keoladeo National Park, Bharatpur was forwarded by the Government of Rajasthan seeking assistance from Planning Commission as advised and approved by the Ministry of Environment and Forests. Keeping in view the uniqueness of the eco system and the capacity to attract a variety of migratory birds the project was thought to be approved in principal with the caveat that the cost be firmed up after a visit to the site by an expert team. The park is in danger of being removed as a Ramsar Site as well as UNESCO World Heritage Site, due to severe drought and abandoning of the park mid way by nesting birds in the year 2007.
A proposal for water supply to Keoladeo National Park, Bharatpur was forwarded by the Government of Rajasthan seeking assistance from Planning Commission as advised and approved by the Ministry of Environment and Forests (MoEF) vide their letter dated 10.04.2008. As per the MoEF, the proposal is beyond the purview of the existing centrally sponsored scheme of the MoEF, seems to be viable and has the potential to put an end to the eternal water scarcity in Bharatpur National Park.
The Keoladeo National Park (KNP) is a Ramsar Wetland Site and a World Heritage site. Due to acute water scarcity the ecosystem of the Park has been affected badly and this has resulted in reduction in the arrival of migratory birds in the National Park. Water supply is essential for the National Park, which is a wetland and a Ramsar site facing acute shortage of water for the last few years. Currently apart from rain fall the Park receives water from “Ajan Bund”, a temporary reservoir via the Dakan canal. Through a small canal dug last year water from Khokhar Weir (Bees Mora) is also available. The total requirement of water for the Park is estimated at about 14.17 Million cubic meters (500 MCft). The supply from Ajan Bund is irregular and subject to the bund being full to the extent of reservoir level at 8.5 meters. During the last several years either water is not supplied or supplied insufficiently.
The project had been prepared keeping in view the need for 400 MCFT of water during late July to August, for a period of 30 days to the Park which is to be had by diverting and lifting flood waters of Yamuna. The project thus covered diversion of water during monsoon through underground pipes with lifting arrangements over a length of 16 km. from the off-take point of Goverdhan drain near Santruk village. The estimated cost of the project as proposed by the State Government was to the tune of Rs 650 millions. The project proposed was to channelize water from Govardhan drain to meet the water deficit of KNP during the months of July to September at the time of requirement. The major components of the project were construction of a head regulator with control gate at the drain located in the state, raw water reservoir with capacity of 13,000 m, 3 pump houses, DG sets for pumping station and laying and testing of /PCC/MS pipelines.
Read more about this topic: Keoladeo National Park
Famous quotes containing the word crises:
“Part of the responsibility of being a parent is to arrange situations in childrens lives so they are able to meet crises with a reasonable chance of coping successfully with them.... Parents who believe children are unharmed by crises and will simply bounce back in time seriously misunderstand children.”
—Donald C. Medeiros (20th century)