Kariba Dam - Construction

Construction

The double curvature concrete arch dam was constructed between 1955 and 1959 by Impresit of Italy at a cost of $135,000,000 for the first stage with only the Kariba South power cavern. Final construction and the addition of the Kariba North Power cavern by Mitchell Construction was not completed until 1977 due to largely political problems for a total cost of $480,000,000. 86 men lost their lives during construction..

Read more about this topic:  Kariba Dam

Famous quotes containing the word construction:

    “There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
    —John Dewey (1859–1952)

    “No construction stiff working overtime takes more stress and straining than we did just to stay high.”
    —Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    “There’s no art
    To find the mind’s construction in the face.”
    —William Shakespeare (1564–1616)