Jungang Line - Upgrade

Upgrade

A part of the line was the first to be electrified with the 25 kV/60 Hz AC catenary system in South Korea: the catenary on the 155.2 km long Cheongnyangri–Jecheon section went into service on June 20, 1973. The 29.0 km long extension to Danseong followed on December 30, 1987, finally the 35.0 km long extension to Yeongju on December 23, 1988.

The entire line is foreseen for electrification and double-tracking.