Future Development
In 2002, the MTRC announced that it would use HK$300 million to construct the West and South Island Lines, provided that the Government would award subsidies towards the project. No sooner, in May 2002, the first proposal from the MTRC detailed an extension towards Kennedy Town. However the plan was abruptly brought to a halt due to land reclamation obstacles on the western coast of Hong Kong Island, and the enormous cost and uncertainties concerning the Hong Kong Government's subsidies for the project. However, the current plan for the new lines to the Southern District would require parts of the Western extension in order for it to be completed. As a result, the MTR Corporation was conducting extensive surveys as well as public forums to gather opinion and suggestions concerning the alignment of the extension and location of the Sai Ying Pun, Shek Tong Tsui and Kennedy Town stations for the West Island Line.
(note: The latest proposal has changed the name of the station University to Shek Tong Tsui, since the panel has unanimously agreed that MTR stations should be named after districts, rather than after public infrastructures or landmarks. However, this does not apply to the Airport Express Line.)
According to implementation options revealed by the MTRC in February 2005, the Island Line will be extended to Kennedy Town, and the South Island Line (West Section) to begin at University station. This option suggests there would be two stations in the areas of Shek Tong Tsui and Sai Ying Pun, between Kennedy Town and Sheung Wan on the West Island Line.
As of 30 June 2005, the MTR Corporation Limited has been given approval to extend the existing Island Line to Kennedy Town, along with two intermediate stations at Sai Ying Pun and University (Shek Tong Tsui). The extension would be approximately 3 km long, making the Island Line the lengthiest urban line (16.1 km) and the one with the most stations (17 stations).
If the North Island Line is built along the northern shore of Hong Kong Island, which is tentatively scheduled to be built after 2016, the Island Line will be split in two; the section from Sheung Wan to Tin Hau will be taken over by the Tseung Kwan O Line, and the Tung Chung Line will oversee operation of the section from Fortress Hill to Chai Wan.
Read more about this topic: Island Line (MTR)
Famous quotes containing the words future and/or development:
“The difference between Pound and Whitman is not between the democrat who in deep distress could look hopefully toward the future and the fascist madly in love with the past. It is that between the woodsman and the woodcarver. It is that between the mystic harking back to his vision and the artist whose first allegiance is to his craft, and so to the reality it presents.”
—Babette Deutsch (18951982)
“The work of adult life is not easy. As in childhood, each step presents not only new tasks of development but requires a letting go of the techniques that worked before. With each passage some magic must be given up, some cherished illusion of safety and comfortably familiar sense of self must be cast off, to allow for the greater expansion of our distinctiveness.”
—Gail Sheehy (20th century)