Questions To Be Asked While Building A Fishbone Diagram
Man/Operator – Was the document properly interpreted? – Was the information properly circulated to all the functions? – Did the recipient understand the information? – Was the proper training to perform the task administered to the person? – Was too much judgment required to perform the task? – Were guidelines for judgment available? – Did the environment influence the actions of the individual? – Are there distractions in the workplace? – Is fatigue a mitigating factor? - Is his work efficiency acceptable? - Is he responsible/accountable? - Is he qualified? - Is he experienced? - Is he medically fit and healthy? – How much experience does the individual have in performing this task? - can he carry out the operation without error?
Machines – Was the correct tool/tooling used? - Does it meet production requirements? - Does it meet process capabilities? – Are files saved with the correct extension to the correct location? – Is the equipment affected by the environment? – Is the equipment being properly maintained (i.e., daily/weekly/monthly preventative maintenance schedule) – Does the software or hardware need to be updated? – Does the equipment or software have the features to support our needs/usage? - Was the machine properly maintained? – Was the machine properly programmed? – Is the tooling/fixturing adequate for the job? – Does the machine have an adequate guard? – Was the equipment used within its capabilities and limitations? – Are all controls including emergency stop button clearly labeled and/or color coded or size differentiated? – Is the equipment the right application for the given job?
Measurement – Does the gauge have a valid calibration date? – Was the proper gauge used to measure the part, process, chemical, compound, etc.? – Was a gauge capability study ever performed? - Do measurements vary significantly from operator to operator? - Do operators have a tough time using the prescribed gauge? - Is the gauge fixturing adequate? – Does the gauge have proper measurement resolution? – Did the environment influence the measurements taken?
Material (Includes Raw Material, Consumables and Information ) – Is all needed information available and accurate? – Can information be verified or cross-checked? – Has any information changed recently / do we have a way of keeping the information up to date? – What happens if we don't have all of the information we need? – Is a Material Safety Data Sheet (MSDS) readily available? – Was the material properly tested? – Was the material substituted? – Is the supplier’s process defined and controlled? - Was the raw material defective? - was the raw material the wrong type for the job? – Were quality requirements adequate for the part's function? – Was the material contaminated? – Was the material handled properly (stored, dispensed, used & disposed)?
Method – Was the canister, barrel, etc. labeled properly? – Were the workers trained properly in the procedure? – Was the testing performed statistically significant? – Was data tested for true root cause? – How many “if necessary” and “approximately” phrases are found in this process? – Was this a process generated by an Integrated Product Development (IPD) Team? – Did the IPD Team employ Design for Environmental (DFE) principles? – Has a capability study ever been performed for this process? – Is the process under Statistical Process Control (SPC)? – Are the work instructions clearly written? – Are mistake-proofing devices/techniques employed? – Are the work instructions complete? - Is the work standard upgraded and to current revision? – Is the tooling adequately designed and controlled? – Is handling/packaging adequately specified? – Was the process changed? – Was the design changed? - Are the lighting and ventilation adequate? – Was a process Failure Modes Effects Analysis (FMEA) ever performed? – Was adequate sampling done? – Are features of the process critical to safety clearly spelled out to the Operator?
Environment – Is the process affected by temperature changes over the course of a day? – Is the process affected by humidity, vibration, noise, lighting, etc.? – Does the process run in a controlled environment? – Are associates distracted by noise, uncomfortable temperatures, fluorescent lighting, etc.?
Management - Is management involvement seen? – Inattention to task – Task hazards not guarded properly – Other (horseplay, inattention....) – Stress demands – Lack of Process – Training or education lacking – Poor employee involvement – Poor recognition of hazard – Previously identified hazards were not eliminated
Read more about this topic: Ishikawa Diagram
Famous quotes containing the words questions, asked, building and/or diagram:
“You mustnt always believe what I say. Questions tempt you to tell lies, particularly when there is no answer.”
—Pablo Picasso (18811973)
“So, summoning his masters debtors one by one, he asked the first, How much do you owe my master? He answered, A hundred jugs of olive oil. He said to him, Take your bill, sit down quickly, and make it fifty.”
—Bible: New Testament, Luke 16:5,6.
“For we know that if the earthly tent we live in is destroyed, we have a building from God, a house not made with hands, eternal in the heavens.”
—Bible: New Testament, 2 Corinthians 5:1.
“Gods fire upon the wane,
A diagram hung there instead,
More women born than men.”
—William Butler Yeats (18651939)