Future Improvements

MassDOT is currently adding a fourth lane in each direction along the beltway section from the I-95 interchange in Canton to the Route 9 interchange in Wellesley, where the rush-hour traffic has been for some time permitted to use the breakdown lanes on the highway shoulder. The section south of Route 109 is complete, while the section to the north is due to be completed by 2015. Outside of the beltway, the state will begin a $285 million project in 2012 to replace the John Greenleaf Whittier Bridge over the Merrimack River and widening the highway to eight lanes (four in each direction) from the bridge to I-495.

Read more about this topic:  Interstate 95 In Massachusetts

Famous quotes containing the words future and/or improvements:

    If nations always moved from one set of furnished rooms to another—and always into a better set—things might be easier, but the trouble is that there is no one to prepare the new rooms. The future is worse than the ocean—there is nothing there. It will be what men and circumstances make it.
    Alexander Herzen (1812–1870)

    I was interested to see how a pioneer lived on this side of the country. His life is in some respects more adventurous than that of his brother in the West; for he contends with winter as well as the wilderness, and there is a greater interval of time at least between him and the army which is to follow. Here immigration is a tide which may ebb when it has swept away the pines; there it is not a tide, but an inundation, and roads and other improvements come steadily rushing after.
    Henry David Thoreau (1817–1862)