Interstate 95 in Massachusetts - Future Improvements

Future Improvements

MassDOT is currently adding a fourth lane in each direction along the beltway section from the I-95 interchange in Canton to the Route 9 interchange in Wellesley, where the rush-hour traffic has been for some time permitted to use the breakdown lanes on the highway shoulder. The section south of Route 109 is complete, while the section to the north is due to be completed by 2015. Outside of the beltway, the state will begin a $285 million project in 2012 to replace the John Greenleaf Whittier Bridge over the Merrimack River and widening the highway to eight lanes (four in each direction) from the bridge to I-495.

Read more about this topic:  Interstate 95 In Massachusetts

Famous quotes containing the words future and/or improvements:

    I am always glad to think that my education was, for the most part, informal, and had not the slightest reference to a future business career. It left me free and untrammeled to approach my business problems without the limiting influence of specific training.
    Alice Foote MacDougall (1867–1945)

    ... these great improvements of modern times are blessings or curses on us, just in the same ratio as the mental, moral, and religious rule over the animal; or the animal propensities of our nature predominate over the intellectual and moral. The spider elaborates poison from the same flower, in which the bee finds materials out of which she manufactures honey.
    Harriot K. Hunt (1805–1875)