Interstate 95 in Massachusetts - Future Improvements

Future Improvements

MassDOT is currently adding a fourth lane in each direction along the beltway section from the I-95 interchange in Canton to the Route 9 interchange in Wellesley, where the rush-hour traffic has been for some time permitted to use the breakdown lanes on the highway shoulder. The section south of Route 109 is complete, while the section to the north is due to be completed by 2015. Outside of the beltway, the state will begin a $285 million project in 2012 to replace the John Greenleaf Whittier Bridge over the Merrimack River and widening the highway to eight lanes (four in each direction) from the bridge to I-495.

Read more about this topic:  Interstate 95 In Massachusetts

Famous quotes containing the words future and/or improvements:

    I want the necessity of supplying my own wants. All this costly culture of yours is not necessary. Greatness does not need it. Yonder peasant, who sits neglected, carries a whole revolution of man and nature in his head, which shall be a sacred history to some future ages.
    Ralph Waldo Emerson (1803–1882)

    The improvements of ages have had but little influence on the essential laws of man’s existence: as our skeletons, probably, are not to be distinguished from those of our ancestors.
    Henry David Thoreau (1817–1862)