Interstate 285 - History

History

I-285 was opened in 1969 at a cost of $90 million, as a four-lane freeway throughout (two lanes each way).

The reconstruction of I-285, particularly on the top-end and the Spaghetti Junction reconfiguration (covered by the revive285 project), has cost about $355 million.

Until 2000, the state of Georgia used the sequential interchange numbering system on all of its Interstate highways. The first exit on each highway would begin with the number "1" and increase numerically with each exit. In 2000, the Georgia Department of Transportation switched to a mileage-based exit system, in which the exit number corresponded to the nearest milepost.

Read more about this topic:  Interstate 285

Famous quotes containing the word history:

    The second day of July 1776, will be the most memorable epoch in the history of America. I am apt to believe that it will be celebrated by succeeding generations as the great anniversary festival. It ought to be commemorated, as the day of deliverance, by solemn acts of devotion to God Almighty. It ought to be solemnized with pomp and parade, with shows, games, sports, guns, bells, bonfires and illuminations, from one end of this continent to the other, from this time forward forever more
    John Adams (1735–1826)

    History is the present. That’s why every generation writes it anew. But what most people think of as history is its end product, myth.
    —E.L. (Edgar Lawrence)

    The history of the genesis or the old mythology repeats itself in the experience of every child. He too is a demon or god thrown into a particular chaos, where he strives ever to lead things from disorder into order.
    Ralph Waldo Emerson (1803–1882)