Indirect Vs Direct Costs
Most cost estimates are broken down into direct costs and indirect costs.
Direct costs are directly attributable to the cost object. In construction, the costs of materials, labor, equipment, etc, and all directly involved efforts or expenses for the cost object are direct costs. In manufacturing or other non-construction industries the portion of operating costs that is directly assignable to a specific product or process is a direct cost. Direct costs are those for activities or services that benefit specific projects, for example salaries for project staff and materials required for a particular project. Because these activities are easily traced to projects, their costs are usually charged to projects on an item-by-item basis.
Indirect costs are not directly attributable to a cost object. Indirect costs are typically allocated to a cost object on some basis. In construction, all costs which are required for completion of the installation, but are not directly attributable to the cost object are indirect, such as overhead. In manufacturing, costs not directly assignable to the end product or process are indirect. These may be costs for management, insurance, taxes, or maintenance, for example. Indirect costs are those for activities or services that benefit more than one project. Their precise benefits to a specific project are often difficult or impossible to trace. For example, it may be difficult to determine precisely how the activities of the director of an organization benefit a specific project. Indirect costs do not vary substantially within certain production volumes or other indicators of activity, and so they may sometimes be considered to be fixed costs.
It is possible to justify the handling of almost any kind of cost as either direct or indirect. Labor costs, for example, can be indirect, as in the case of maintenance personnel and executive officers; or they can be direct, as in the case of project staff members. Similarly, materials such as miscellaneous supplies purchased in bulk—pencils, pens, paper—are typically handled as indirect costs, while materials required for specific projects are charged as direct costs.
Read more about this topic: Indirect Costs
Famous quotes containing the words indirect, direct and/or costs:
“If there is a case for mental events and mental states, it must be that the positing of them, like the positing of molecules, has some indirect systematic efficacy in the development of theory.”
—Willard Van Orman Quine (b. 1908)
“Long as I have lived, and many blasphemers as I have heard and seen, I have never yet heard or witnessed any direct and conscious blasphemy or irreverence; but of indirect and habitual, enough. Where is the man who is guilty of direct and personal insolence to Him that made him?”
—Henry David Thoreau (18171862)
“It costs more to maintain ten vices than one virtue.”
—H.L. (Henry Lewis)