Adoption of The International Gauge in Spain and Portugal
Since the beginning of the 1990s new high-speed passenger lines in Spain have been built to the international standard gauge of 1,435 mm (4 ft 8 1⁄2 in), to allow these lines to link to the European high-speed network. Although the 22 km from Tardienta to Huesca (part of a branch from the Madrid to Barcelona high-speed line) has been reconstructed as mixed Iberic and standard gauge, in general the interface between the two gauges in Spain is dealt with by means of gauge-changing installations, which can adjust the gauge of appropriately designed wheelsets on the move.
Plans exist to convert more of the Iberian-gauge network in Spain and Portugal to standard gauge, an indication of which is the use, on several stretches of recently relaid broad-gauge track, of concrete sleepers pre-drilled with additional bolt holes allowing for repositioning of one rail to adjust the track to international gauge or the narrowing of the gauge by moving both rails closer together maintaining the perfect alignment of the loading gauge.
Read more about this topic: Iberian Gauge
Famous quotes containing the words adoption and/or spain:
“Frankly, I adore your catchy slogan, Adoption, not Abortion, although no one has been able to figure out, even with expert counseling, how to use adoption as a method of birth control, or at what time of the month it is most effective.”
—Barbara Ehrenreich (b. 1941)
“last time I saw you was the hospital
pale skull protruding under ashen skin
blue veined unconscious girl
in an oxygen tent
the war in Spain has ended long ago
Aunt Rose”
—Allen Ginsberg (b. 1926)