Design and Development
Israel had to replace more than 60 aircraft lost during the Six Day War and the War of Attrition which followed. This began the cooperation with Dassault to build the Mirage 5. The Mirage 5 was named Raam in Hebrew (thunder).
Dassault Aviation had developed the Mirage 5 at the request of the Israelis, who were the main foreign customers of the Mirage III. The Israeli Air Force (IAF) wanted the next version to have less all-weather capability in exchange for improved ordnance carrying capacity and range as the weather in the Middle East is mostly clear.
In January, 1969 the French government arms embargo on Israel (on the eve of the Six Day War and after the Israeli attack of the airport of Beirut, in 1969) prevented the first 30 Mirage 5 aircraft (which were already paid for by Israel) plus optional 20 from being delivered and cut off support for the existing Mirage IIICJ fleet.
This was bad news for the Israeli Air Force, who needed the new Mirage to compensate for the losses of the Six Day War and was still using the origin of this version derived from the Mirage III. Israel then decided to build this plane (Raam A and B project) as it had the necessary plans, although Israel did not obtain a manufacturing license.
Officially, Israel built the aircraft after obtaining complete blueprints. However, some sources claim Israel received 50 Mirage 5s in crates from French Air Force (AdA), while the AdA took over the 50 aircraft originally intended for Israel.
The production began in 1969 with the first empty cell (no weapons, no electronics, no seat, no engine) delivered directly from Dassault Aviation because spare parts were not subjected to the embargo. The first Raam A is delivered in May, 1971. In November, 1971 the plane was renamed Nesher.
The Nesher was identical to the Mirage 5, except for the use of some Israeli avionics, a Martin-Baker zero-zero ejection seat, and provisions for a wider range of AAMs (Air-to-Air Missiles), including the Israeli Shafrir heat-seeking missile. Fifty-one Nesher fighters (Nesher S) and ten Nesher two-seat trainers (Nesher T) were built in all.
The Nesher had simpler avionics than the Mirage IIIC, although it was found by Israeli pilots to be slightly less maneuverable. However, it had longer range and bigger payload. The reduced maneuverability did not prevent the Nesher from giving a good account of itself in air combat during the Yom Kippur war.
Nesher production was phased out from 1978 to make way for an improved Mirage derivative that had been planned in parallel, in which the Atar engine was replaced by an Israeli-built General Electric J79 engine, the engine used on the American F-104 Starfighter and F-4 Phantom II fighters. The result was the IAI Kfir.
Read more about this topic: IAI Nesher
Famous quotes containing the words design and/or development:
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)
“As a final instance of the force of limitations in the development of concentration, I must mention that beautiful creature, Helen Keller, whom I have known for these many years. I am filled with wonder of her knowledge, acquired because shut out from all distraction. If I could have been deaf, dumb, and blind I also might have arrived at something.”
—Mark Twain [Samuel Langhorne Clemens] (18351910)