An invitation to tender for a new helicopter carrier was issued in February 1992. In February 1993 The Times reported that the carrier faced cancellation due to budgetary constraints. However, at approximately the same time, British forces were engaged in operations in the Balkans, which saw the Royal Fleet Auxiliary's aviation training ship RFA Argus pressed into service as an LPH. Argus proved totally unsuitable in terms of accommodation and facilities needed for a large Embarked Military Force (EMF), which emphasised the need for a purpose built platform. On 29 March 1993 the defence procurement minister announced that development of the new LPH was proceeding.
Two shipbuilders competed for the contract - Vickers Shipbuilding and Engineering Ltd (VSEL) and Swan Hunter. On 11 May 1993 the government announced VSEL had won the contract. The build was to commercial standards, reducing costs significantly and leading to a construction spend of £154 million (£234 million as of 2012),, comparable to that of a Type 23 frigate. VSEL, a warship manufacturer, sub-contracted the build phase to the commercial Kværner yard in Govan, Glasgow.
The fact that VSEL's bid was £71 million lower than Swan Hunter's was the source of political controversy and led to a National Audit Office investigation to determine whether the competition was fair. The report, published on 29 July 1993, stated that although VSEL did subsidise its bid the MoD was right to award the contract to VSEL because the subsidy was much smaller than the difference between the two bids; VSEL's bid was £139.5 million compared to Swan Hunter's £210.6 million. The Times also suggested that the subsidy was as little as £10 million.
In anticipation of the report the Financial Times described the different philosophies adopted by the two bidders; While Swan Hunter viewed the ships as entirely military, "VSEL thought the design was basically a merchant ship with military hardware bolted on." VSEL's decision to sub-contract the build phase took advantage of lower overheads at a civilian yard as well as efficiency drives by its parent, Kværner. The cut-price build to commercial standards means that Ocean has a projected operational life of just 20 years, significantly less than that of other warships.
Launched on 11 October 1995, she was subsequently named at Barrow by Her Majesty the Queen on 20 February 1998, prior to delivery to Devonport.
In her sea trial she managed to reach a top speed of 20.6 knots (38.2 km/h; 23.7 mph), however her usual top speed is 18 knots (33 km/h; 21 mph) now totally fitted out and with the addition of new equipment.
Read more about this topic: HMS Ocean (L12)
Famous quotes containing the word construction:
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)