HMS Dreadnought (S101) - Design and Construction

Design and Construction

The Royal Navy had been researching designs for nuclear propulsion plants since 1946, but this work was suspended indefinitely in October 1952 In 1955 the United States Navy completed USS Nautilus, the world's first nuclear-powered submarine. During subsequent exercises with the Royal Navy, Nautilus demonstrated the advantages of the nuclear submarine against British anti-submarine forces, which had developed extensive anti-submarine warfare techniques during the Second Battle of the Atlantic. The Admiralty appreciated the utility of such vessels and under the drive of the First Sea Lord, Admiral The Earl Mountbatten of Burma and the Flag Officer Submarines, Sir Wilfred Woods, plans were formed to build nuclear-powered submarines.

Although the plan was to build all-British nuclear submarines, much time would be saved by accepting the American technological lead and taking advantage of US nuclear technology. The excellent relations between Admiral Mountbatten and US Navy Chief of Naval Operations Arleigh Burke, expedited obtaining that help. This was despite Rear Admiral Hyman Rickover, in charge of the American naval nuclear power program, being set against any transfer of technology; indeed, Rickover prevented Mountbatten inspecting USS Nautilus. It was not until a visit to Britain in 1956 that Rickover changed his mind and withdrew his objections. Although Rickover wished to supply the third generation S3W reactor of the Skate class, Mountbatten exerted his influence and the entire machinery system for an American Skipjack-class submarine, with its fifth generation S5W reactor, was obtained. This was known as the "American Sector" (see 1958 US-UK Mutual Defence Agreement). The hull and combat systems of Dreadnought were of British design and construction, although British access to the Electric Boat Company influenced the hull form and construction practices.

Dreadnought was laid down on 12 June 1959, and launched by Queen Elizabeth II on Trafalgar Day, 21 October 1960. The reactor was embarked in 1962 and Dreadnought made her first dive, in Ramsden Dock, on 10 January 1963. She commissioned on 17 April 1963.

During Dreadnought's construction, Rolls-Royce, in collaboration with the United Kingdom Atomic Energy Authority at the Admiralty Research Station, HMS Vulcan, at Dounreay, developed a completely new British nuclear propulsion system. On 31 August 1960, the UK's second nuclear-powered submarine was ordered from Vickers Armstrong and, fitted with Rolls-Royce's PWR1 nuclear plant, Valiant was the first all-British nuclear submarine.

Read more about this topic:  HMS Dreadnought (S101)

Famous quotes containing the words design and/or construction:

    The reason American cars don’t sell anymore is that they have forgotten how to design the American Dream. What does it matter if you buy a car today or six months from now, because cars are not beautiful. That’s why the American auto industry is in trouble: no design, no desire.
    Karl Lagerfeld (b. 1938)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)