Hanford Site - Cold War Expansion

Cold War Expansion

In September 1946, the General Electric Company assumed management of the Hanford Works under the supervision of the newly created Atomic Energy Commission. As the Cold War began, the United States faced a new strategic threat in the rise of the Soviet nuclear weapons program. In August 1947, the Hanford Works announced funding for the construction of two new weapons reactors and research leading to the development of a new chemical separations process. With this announcement, Hanford entered a new phase of expansion.

By 1963, the Hanford Site was home to nine nuclear reactors along the Columbia River, five reprocessing plants on the central plateau, and more than 900 support buildings and radiological laboratories around the site. Extensive modifications and upgrades were made to the original three World War II reactors, and a total of 177 underground waste tanks were built. Hanford was at its peak production from 1956 to 1965. Over the entire 40 years of operations, the site produced about 63 short tons (57 t) of plutonium, supplying the majority of the 60,000 weapons in the U.S. arsenal. Uranium-233 was also produced.

Read more about this topic:  Hanford Site

Famous quotes containing the words cold, war and/or expansion:

    Poems stirred
    into paper coffee-cups, eaten
    with petals on rye in the
    sun—the cold shadows in back,
    and the traffic grinding the
    borders of spring ...
    Denise Levertov (b. 1923)

    Not marble nor the gilded monuments
    Of princes shall outlive this powerful rime;
    But you shall shine more bright in these contents
    Than unswept stone, besmeared with sluttish time.
    When wasteful war shall statues overturn,
    And broils root out the work of masonry,
    Nor Mars his sword nor war’s quick fire shall burn
    The living record of your memory.
    William Shakespeare (1564–1616)

    Artistic genius is an expansion of monkey imitativeness.
    W. Winwood Reade (1838–1875)