Grand Coulee Dam - Operation and Benefits

Operation and Benefits

The dam's primary goal, irrigation, was postponed as the wartime need for electricity increased. The dam's powerhouse began production around the time World War II began, and its electricity was vital to the war effort. The dam powered aluminum smelters in Longview and Vancouver, Washington, Boeing factories in Seattle and Vancouver, and Portland's shipyards. In 1943, its electricity was also used for plutonium production in Richland, Washington, at the Hanford Site, which was part of the top-secret Manhattan Project. The demand for power at that project was so great that in 1943, two generators originally intended for the Shasta Dam were installed at Grand Coulee in an effort to hurry the generator installation schedule.

Read more about this topic:  Grand Coulee Dam

Famous quotes containing the words operation and/or benefits:

    You may read any quantity of books, and you may almost as ignorant as you were at starting, if you don’t have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.
    Thomas Henry Huxley (1825–95)

    It is with benefits as with injuries in this respect, that we do not so much weigh the accidental good or evil they do us, as that which they were designed to do us.—That is, we consider no part of them so much as their intention.
    Laurence Sterne (1713–1768)