Gloucester and Sharpness Canal - Recent History

Recent History

Today the canal can be used by boats up to 64m in length, 9.6m in beam and 32m in height. The maximum draft is 3.5 m. By the mid 1980s commercial traffic had largely come to a halt with the canal being given over to pleasure cruisers with the exception of a few passages by grain barges. The oil trade ceased in 1985 with the closure of the petroleum depot at Quedgeley. In order to allow the A430 south-west bypass to be built the canal had to be diverted. The new section of channel was opened on 6 May 2006. In January 2009 a project began to replace the Patch Bridge swing bridge with a motor powered design instead of the current hand cranked system.

The canal links directly to the Stroudwater Navigation at Saul junction.

Read more about this topic:  Gloucester And Sharpness Canal

Famous quotes containing the word history:

    Both place and time were changed, and I dwelt nearer to those parts of the universe and to those eras in history which had most attracted me.
    Henry David Thoreau (1817–1862)

    I assure you that in our next class we will concern ourselves solely with the history of Egypt, and not with the more lurid and non-curricular subject of living mummies.
    Griffin Jay, and Reginald LeBorg. Prof. Norman (Frank Reicher)