Plans
Several options to expand Gatwick have been considered, including a third terminal and a second runway to the south of the existing runway. This would allow Gatwick to handle more passengers than Heathrow does today. If a second, wide-spaced (as opposed to close parallel) runway is approved, a new terminal could be sited between the two runways. This could either complement or replace the current South Terminal, depending on expected future traffic developments.
A less ambitious alternative would extend the North Terminal further south, with another passenger bridge to an area currently occupied by aircraft stands without jet bridges (Pier 7). However, figure A.12 in Gatwick's new draft master plan released for consultation on 13 October 2011 seems to discard the earlier-mooted Pier 7 option in favour of a mid-field satellite adjacent to the control tower that would be linked to the North Terminal if built as part of an expanded single-runway, two-terminal airport scenario around 2030. There are also plans to extend Pier 6.
In October 2009, BAA submitted planning applications for Gatwick to handle an extra six million passengers a year by 2018 and for an extension to the North Terminal to provide new check-in facilities and additional baggage reclaim hall capacity, along with a 900 space short-stay car park. Crawley Borough Council's decision to approve these plans was upheld in November 2009 by the Government's refusal to hold a public inquiry despite objections from local environmental protesters.
Speaking at the first Gatwick Airport Consultative Committee (Gatcom) meeting since GIP's takeover of the airport (held on 28 January 2010 at Crawley's Arora Hotel), Gatwick's chairman Sir David Rowlands ruled out building a second runway for the foreseeable future, citing the high cost of the associated planning application – estimated to be between £100 million and £200 million – as the main reason for the new owners' lack of interest. At that meeting, Gatwick chief executive Stewart Wingate stressed GIP's preference for increasing the existing runway's capacity and confirmed GIP's plans to request an increase in the current limit on the permitted number of take-offs and landings.
In October 2010, Gatwick Airport Limited (GAL) received planning permission from Crawley Borough Council to adapt both terminals to handle the Airbus A380 on a regular, commercial basis. At the Gatcom meeting held on 26 January 2012 at Crawley's Arora Hotel, GAL announced that its board had approved construction of A380 pier infrastructure that was expected to be ready by summer 2013. This will feature a new three-bridge gate at Pier 6.
Read more about this topic: Gatwick Airport
Famous quotes containing the word plans:
“In preparing for battle I have always found that plans are useless, but planning is indispensable.”
—Dwight D. Eisenhower (18901969)
“Architect. One who drafts a plan of your house, and plans a draft of your money.”
—Ambrose Bierce (18421914)
“The fellow parent you are scared to call is as appalled by the cliques plans as you are. . . . The other parent is as happy to hear from you as you would be to hear from him.”
—Fred G. Gosman (20th century)