Frankfurt Airport - Future Expansions

Future Expansions

With the inauguration of the fourth runway in October 2011, the airport should be able to handle the predicted demand of about 700,000 aircraft movements in 2020. To handle the predicted passenger amount of 90 million in 2020, a third terminal is scheduled to be built south of the existing terminals beginning in 2013.

Terminal 3

Fraport plans to build a large new terminal south of the existing terminals at the ground of the former Rhein-Main Air Base. The new Terminal 3 should be able to house up to 25 million passengers and will feature 75 new aircraft positions. An extension of the people mover system SkyLine is planned to transport people to Terminal 1, the airport railway stations and Terminal 2.

Read more about this topic:  Frankfurt Airport

Famous quotes containing the word future:

    One merit in Carlyle, let the subject be what it may, is the freedom of prospect he allows, the entire absence of cant and dogma. He removes many cartloads of rubbish, and leaves open a broad highway. His writings are all unfenced on the side of the future and the possible. Though he does but inadvertently direct our eyes to the open heavens, nevertheless he lets us wander broadly underneath, and shows them to us reflected in innumerable pools and lakes.
    Henry David Thoreau (1817–1862)