Future Expansions
With the inauguration of the fourth runway in October 2011, the airport should be able to handle the predicted demand of about 700,000 aircraft movements in 2020. To handle the predicted passenger amount of 90 million in 2020, a third terminal is scheduled to be built south of the existing terminals beginning in 2013.
Terminal 3
Fraport plans to build a large new terminal south of the existing terminals at the ground of the former Rhein-Main Air Base. The new Terminal 3 should be able to house up to 25 million passengers and will feature 75 new aircraft positions. An extension of the people mover system SkyLine is planned to transport people to Terminal 1, the airport railway stations and Terminal 2.
Read more about this topic: Frankfurt Airport
Famous quotes containing the word future:
“The future is made of the same stuff as the present.”
—Simone Weil (19091943)