After The Merger
In 2003, the company installed its first UNI-GS detachable chairlift, the Panorama Quad, at Gunstock Mountain Resort in Gilford, New Hampshire.
In 2003, the company was selected to design, fabricate, install and maintain the Portland Aerial Tram at a cost of $57 million.
In 2005, the company purchased Partek, a small chairlift manufacturer based in Pine Island, New York. Also included in the purchase were Partek's rights to Borvig lifts.
Jan Leonard stepped down as president of the company in October 2007 to start a new company, Skytrac Lifts. He was replaced by VP Mark Bee.
In 2007 and 2008, Doppelmayr CTEC constructed two notable lifts at Jackson Hole, Wyoming, and Whistler Blackcomb, British Columbia. The new tram at Jackson Hole cost $28 million and replaced the iconic original Jackson Hole Tram. Whistler-Blackcomb's Peak 2 Peak Gondola is the largest lift of its kind in the world, breaking multiple world records and costing CDN $52 million.
On January 1, 2011, the company dropped CTEC from its name to become Doppelmayr USA.