Critical Path Method

Critical Path Method

The critical path method (CPM) is an algorithm for scheduling a set of project activities. It is an important tool for effective project management.

Read more about Critical Path Method:  History, Basic Technique

Famous quotes containing the words critical, path and/or method:

    Post-modernism has cut off the present from all futures. The daily media add to this by cutting off the past. Which means that critical opinion is often orphaned in the present.
    John Berger (b. 1926)

    Among the best traitors Ireland has ever had, Mother Church ranks at the very top, a massive obstacle in the path to equality and freedom. She has been a force for conservatism, not on the basis of preserving Catholic doctrine or preventing the corruption of her children, but simply to ward off threats to her own security and influence.
    Bernadette Devlin (b. 1947)

    There is no method but to be very intelligent.
    —T.S. (Thomas Stearns)