Other River Structures
When the Cowlitz Salmon Hatchery began operation in 1968, it was the largest salmon hatchery in the world. Currently, it produces nearly 13 million fish each year. Adjacent to the salmon hatchery is the barrier dam, which diverts spawning and upriver migrating fish to a separating station where fish are sorted by species. Some of the fish are used by the hatchery while others are transported upstream to continue migration.
The Bonneville Power Administration, in cooperation with the Lewis County PUD, state and federal agencies and Tacoma Power, constructed a downstream anadromous fish collection facility as part of the Cowlitz Falls Project. The fish facility, along with the Cowlitz River Salmon Hatchery's diversion dam below Mayfield Lake, has permitted the reintroduction of salmon and steelhead in the upper Cowlitz River basin for the first time since the construction of the Mossyrock and Mayfield dams in the 1960s.
Read more about this topic: Cowlitz River
Famous quotes containing the words river and/or structures:
“But not luck
brought us here. By design
clear air and cold wind polish
the river lights, by design
we are to live now in a new place.”
—Denise Levertov (b. 1923)
“It is clear that all verbal structures with meaning are verbal imitations of that elusive psychological and physiological process known as thought, a process stumbling through emotional entanglements, sudden irrational convictions, involuntary gleams of insight, rationalized prejudices, and blocks of panic and inertia, finally to reach a completely incommunicable intuition.”
—Northrop Frye (b. 1912)