Infrastructure
The line is single track between the following places.
- Wolvercot Junction, (about 3 miles or 5 kilometres north of Oxford) and Charlbury.
- 1 mile or 1.6 kilometres west of Evesham and Norton Junction (3 miles or 4.8 kilometres south east of Worcester Shrub Hill)
- Worcester Shrub Hill through Worcester Foregate Street to Henwick.
- Malvern Wells, (1 mile or 1.6 kilometres south of Great Malvern) and Shelwick Junction (1.7 miles or 2.7 kilometres north of Hereford) with a crossing place at Ledbury.
Other sections are double track.
Significant civil engineering structures on the line include Campden Tunnel (875 yards or 800 metres), the Colwall Tunnels (1,567 yards or 1,433 metres), Ledbury Tunnel (1,323 yards or 1,210 metres) and viaducts at Worcester and Ledbury.
Read more about this topic: Cotswold Line