Performance of Control Charts
When a point falls outside of the limits established for a given control chart, those responsible for the underlying process are expected to determine whether a special cause has occurred. If one has, it is appropriate to determine if the results with the special cause are better than or worse than results from common causes alone. If worse, then that cause should be eliminated if possible. If better, it may be appropriate to intentionally retain the special cause within the system producing the results.
It is known that even when a process is in control (that is, no special causes are present in the system), there is approximately a 0.27% probability of a point exceeding 3-sigma control limits. So, even an in control process plotted on a properly constructed control chart will eventually signal the possible presence of a special cause, even though one may not have actually occurred. For a Shewhart control chart using 3-sigma limits, this false alarm occurs on average once every 1/0.0027 or 370.4 observations. Therefore, the in-control average run length (or in-control ARL) of a Shewhart chart is 370.4.
Meanwhile, if a special cause does occur, it may not be of sufficient magnitude for the chart to produce an immediate alarm condition. If a special cause occurs, one can describe that cause by measuring the change in the mean and/or variance of the process in question. When those changes are quantified, it is possible to determine the out-of-control ARL for the chart.
It turns out that Shewhart charts are quite good at detecting large changes in the process mean or variance, as their out-of-control ARLs are fairly short in these cases. However, for smaller changes (such as a 1- or 2-sigma change in the mean), the Shewhart chart does not detect these changes efficiently. Other types of control charts have been developed, such as the EWMA chart, the CUSUM chart and the real-time contrasts chart, which detect smaller changes more efficiently by making use of information from observations collected prior to the most recent data point.
Most control charts work best for numeric data with Gaussian assumptions. The real-time contrasts chart was proposed able to handle process data with complex characteristics, e.g. high-dimensional, mix numerical and categorical, missing-valued, non-Gaussian, non-linear relationship.
Read more about this topic: Control Chart
Famous quotes containing the words performance of, performance, control and/or charts:
“There are people who think that wrestling is an ignoble sport. Wrestling is not sport, it is a spectacle, and it is no more ignoble to attend a wrestled performance of suffering than a performance of the sorrows of Arnolphe or Andromaque.”
—Roland Barthes (19151980)
“There are people who think that wrestling is an ignoble sport. Wrestling is not sport, it is a spectacle, and it is no more ignoble to attend a wrestled performance of suffering than a performance of the sorrows of Arnolphe or Andromaque.”
—Roland Barthes (19151980)
“We as a nation need to be reeducated about the necessary and sufficient conditions for making human beings human. We need to be reeducated not as parentsbut as workers, neighbors, and friends; and as members of the organizations, committees, boardsand, especially, the informal networks that control our social institutions and thereby determine the conditions of life for our families and their children.”
—Urie Bronfenbrenner (b. 1917)
“Theres one basic rule you should remember about development charts that will save you countless hours of worry.... The fact that a child passes through a particular developmental stage is always more important than the age of that child when he or she does it. In the long run, it really doesnt matter whether you learn to walk at ten months or fifteen monthsas long as you learn how to walk.”
—Lawrence Kutner (20th century)