|
|
Continues as Dundonald Avenue past this point until extension work complete |
|
|
11th Street W |
Interchange under construction (2013) |
|
|
Clancy Drive |
|
|
Confederation Drive to Highway 7/Highway 14 (22nd Street SW) |
Northbound exit, southbound entrance only |
|
|
Fairmont Drive to 22nd Street W eastbound from SB Circle Drive |
Southbound exit only |
|
|
22nd Street W eastbound offramp merges with Circle Drive northbound; exit from SB on-ramp to Fairmont Drive via Fairlight Drive |
|
|
Highway 7/Highway 14 (22nd Street SW); Fairmont Drive merges with westbound 22nd Street |
|
|
22nd Street W westbound offramp merges with Circle Drive northbound; Exit to 22nd Street W westbound from Circle Drive southbound |
|
|
Confederation Drive northbound from Circle Drive southbound |
|
|
Laurier Drive (alternate route to Confederation Drive) |
|
|
33rd Street W |
|
|
Airport Drive to Saskatoon John G. Diefenbaker International Airport |
City maps also show cul-de-sac Lark Place here but as of 2012 has not been developed |
|
|
Circle Place |
eastbound access only |
|
|
Avenue C N – Becomes arterial road at this point |
Numerous controlled and uncontrolled intersections and property entrances to Millar Avenue |
|
|
Highway 16/Saskatchewan Highway 11 (Idylwyld Drive) |
Highway 16 enters Circle Drive; Diamond interchange with intersections on Circle Drive |
|
|
|
|
|
Millar Avenue/Venture Crescent |
Resumes as freeway past this point |
|
|
Warman Road |
|
|
Circle Drive Bridge over South Saskatchewan River |
|
|
Alternate exit to Preston Avenue southbound |
|
|
Preston Avenue North (southbound)/Attridge Drive (eastbound) |
|
|
108th Street |
Northbound entrance, southbound exit only |
|
|
College Drive |
|
|
14th Street |
Northbound entrance, southbound exit only |
|
|
8th Street E |
|
|
Taylor Street E |
|
|
Continues as Highway 11 south to Regina; Circle Drive continues west from this interchange |
Highway 16 exits Circle Drive and proceeds east towards Yorkton and Portage la Prairie |
|
|
Preston Avenue South |
Interchange under construction (2013) |
|
|
Clarence Avenue |
|
|
Currently continues as Idylwyld Drive; interchange for Circle Drive extension under construction (2013); additional interchange at Lorne Avenue under construction (2013) |
|
|
Circle Drive South Bridge over South Saskatchewan River |
New bridge, under construction (2013) |
|
|
Valley Road |
New interchange planned |
|
|
11th Street W |
Interchange under construction (2013) |
|
|
Current alignment of Circle Drive continues past this point; see top of chart |