Future Expansion
In December 2004, a study concluded that traffic across the bridge was expected to increase by 40% by 2025. The following year, a task force formed by Maryland Governor Robert Ehrlich met to again explore the possibility of establishing a new Chesapeake Bay crossing. The task force concluded that a bridge would be the best option for an additional crossing, and four geographic locations for such a bridge were explored: Baltimore County to Kent County, Anne Arundel County to Queen Anne's County (the existing location), Anne Arundel or Calvert County to Talbot County, and Calvert County to Dorchester County. In late 2006, the task force released a report on the study but did not make a final recommendation; members of the task force requested additional time to continue the study.
Read more about this topic: Chesapeake Bay Bridge
Famous quotes containing the words future and/or expansion:
“One merit in Carlyle, let the subject be what it may, is the freedom of prospect he allows, the entire absence of cant and dogma. He removes many cartloads of rubbish, and leaves open a broad highway. His writings are all unfenced on the side of the future and the possible. Though he does but inadvertently direct our eyes to the open heavens, nevertheless he lets us wander broadly underneath, and shows them to us reflected in innumerable pools and lakes.”
—Henry David Thoreau (18171862)
“Artistic genius is an expansion of monkey imitativeness.”
—W. Winwood Reade (18381875)