Development
The Wirral's other railway routes are provided with frequent Merseyrail electric trains. The Borderlands Line has a relatively infrequent diesel operated service.
Proposals exist to electrify some or all of the line and incorporate it into the Wirral Line of the Merseyrail network, allowing through services to Birkenhead and Liverpool with new stations at Deeside Industrial Park, Woodchurch and Beechwood, but nothing definitive has been confirmed. In August 2006 it was announced there would be a feasibility study into the 3rd-rail electrification of the line.
There have been proposals included in the electrification plan for the construction of two new stations on the Wirral section of the line; Beechwood between Bidston and Upton to serve the Beechwood estate, and Woodchurch to serve Prenton, the Woodchurch estate and the North Cheshire Business Park as well as providing connections to and from most of West Wirral's bus services to Birkenhead, and to "park and ride" travellers from other parts of the Wirral via the M53 motorway.
Read more about this topic: Borderlands Line
Famous quotes containing the word development:
“The highest form of development is to govern one’s self.”
—Zerelda G. Wallace (1817–1901)
“For decades child development experts have erroneously directed parents to sing with one voice, a unison chorus of values, politics, disciplinary and loving styles. But duets have greater harmonic possibilities and are more interesting to listen to, so long as cacophony or dissonance remains at acceptable levels.”
—Kyle D. Pruett (20th century)
“A defective voice will always preclude an artist from achieving the complete development of his art, however intelligent he may be.... The voice is an instrument which the artist must learn to use with suppleness and sureness, as if it were a limb.”
—Sarah Bernhardt (1845–1923)