Predecessor Processes
Before the Bessemer process, Britain had no practical method of reducing the carbon content of pig iron. Steel was manufactured by the reverse process of adding carbon to carbon-free wrought iron, usually imported from Sweden. The manufacturing process, called cementation process, consisted of heating bars of wrought iron together with charcoal for periods of up to a week in a long stone box. This produced blister steel. Up to 3 tons of expensive coke was burnt for each ton of steel produced. Such steel when rolled into bars was sold at £50 to £60 (approximately £3,390 to £4,070 in 2008) a long ton. The most difficult and work-intensive part of the process, however, was the production of wrought iron done in finery forges in Sweden.
This process was refined in the 18th century with the introduction of Benjamin Huntsman's crucible steel-making techniques, which added an additional three hours firing time and required additional large quantities of coke. In making crucible steel the blister steel bars were broken into pieces and melted in small crucibles each containing 20 kg or so. This produced higher quality crucible steel but increased the cost. The Bessemer process reduced the time needed to make steel of this quality to about half an hour while requiring only the coke needed to melt the pig iron initially. The earliest Bessemer converters produced steel for £7 a long ton, although it initially sold for around £40 a ton.
Read more about this topic: Bessemer Process
Famous quotes containing the word processes:
“Our bodies are shaped to bear children, and our lives are a working out of the processes of creation. All our ambitions and intelligence are beside that great elemental point.”
—Phyllis McGinley (19051978)