Beckton Gas Works - Location

Location

The works covered a 550 acres (220 ha) site to the south of the Northern Outfall Sewer, between Woolwich Manor Way and the Thames. The company had considered several sites for the works. The site to the west of Barking Creek was selected as it was possible to build deep water piers in the Thames, enabling direct unloading from steam colliers bringing coal from mines in the North-East of England. There were two piers, for importing coal and exporting by-products. In the 1930s an annual average of a million tons of coal mainly from Durham was unloaded at the main pier, with a further 750,000 tons transhipped to barges for other works. The GLCC had a fleet of seventeen coastal colliers ranging from 1,200 to 2,841 gross register tons, and also chartered larger ships as needed. At this time the plant had a coal storage capacity of 250,000 tons.

The plant had an extensive internal railway system of between 42 and 70 miles (between 68 and 113 km). The Beckton Railway provided a link to the national network at Custom House, used for passenger traffic to the works and for transport of by-products such as coal tar. This was leased and operated by the Great Eastern Railway from 1874. There were no intermediate stations between Custom House station and Beckton railway station, which was at the entrance to the works. The line closed to passengers following bomb damage in 1940, the freight line finally closing in February 1971.

Read more about this topic:  Beckton Gas Works