Batman Dam
The dam construction was started in 1986 and completed in 1999. It has a height of 85 meters and annual power generation capacity of 483 GWh (peak power 198 MW). The associated reservoir has a surface area of 49 km2 and a volume of 1.175 km3. The dam supplies water for the area of 37744 ha.
Read more about this topic: Batman Province
Famous quotes containing the word dam:
“The devil take one party and his dam the other!”
—William Shakespeare (15641616)